Optimising Crew Schedules
to Improve Operational
Efficiency
 
Summary

In a joint case study with Gurobi, read how RACE can quickly generate optimal crew allocation plans that save customers time and money.

RACE’s customer base includes companies operating across the mining value chain, including primary producers, rail haulage providers, terminal operators, rail track owners, mining conglomerates and coordinating bodies.

Find out how RACE has:

  • reduced off-duty drivers called in for work and overtime spend by 50%

  • reduced the total number of drivers required each day by 8%, leading to improved operational efficiency and significant labor cost savings

Download Case Study Read Case Study

Product Used

For rail supply chain stakeholders who want to maximise throughput and asset utilisation, RACE is an online decision support tool that uses industrial mathematics to optimise different combinations of inbound rail, terminal stockpiling and outbound vessel operations.

Learn More About RACE